A certified dwelling, built in a factory and craned onto your site.
Class 1A certified homes, fixed spec and fixed price. One delivery, not a year of trades on your site.
Modular versus traditional.
The work moves off site and into the factory.
| Factor | Traditional build | Arc Modular |
|---|---|---|
| Where it's built | On site, exposed to weather | In a factory, weathertight from day one |
| Pricing certainty | Variable, trade-dependent | Fixed price, published inclusions |
| Site time | Months of trades on site | A single delivery and install event |
| Programme risk | Weather and trade availability | Factory schedule, contract to keys ~16 weeks |
What's included.
What every Arc Modular home comes with.
Exterior
- + V-Groove Deco cladding
- + Lysaght Enseam wall and roof cladding
- + Aluminium-framed windows
- + Colorbond roofing
Interior
- + Oak hybrid flooring
- + Travertine surfaces
- + Oak veneer joinery
- + ABI brushed brass hardware
- + SMEG appliances
Six steps, contract to keys.
Roughly 16 weeks from signed contract to handover.
Design & documentation
Concept confirmed and documentation finalised, carried over from Arc Studio if applicable.
Contract
Build contract signed.
Factory manufacture
The dwelling is fabricated, fitted out and finished in the factory.
Site preparation
Footings and services prepared to receive the module.
Delivery & install
The module is transported and craned into position in a single coordinated event.
Handover
Final connections, inspection and keys.
Built inside, delivered whole.
It leaves the factory finished and goes straight onto its footings.
01 / 07
Footings and piers
Both pads are marked out and the piers are cast, ready to take a module straight off the truck.
Step 1 of 7
Each module arrives finished. Only the breezeway is built on site.
What you arrange. What Arc manages.
Site responsibilities
- 01 Site access for delivery vehicles
- 02 Utility connection points
- 03 Council approval process, typically 6-12 weeks
- 04 Any local permit or neighbour requirements
Delivery responsibilities
- 01 Factory manufacture and finishing
- 02 Transport, OSOM permits and pilot vehicles
- 03 Crane placement on delivery day
- 04 Final connections and handover
How a module actually gets to site.
One oversize load, factory to site.
Design & approval
Confirmed before manufacture begins.
Factory manufacture
~12 weeks.
Delivery scheduling
Confirmed roughly 4 weeks prior.
Install brief issued
2 weeks prior to delivery.
Delivery & install day
Module arrives and is craned into position.
It travels under an oversize permit with a pilot vehicle. Arc and the transport operator manage the permit and the route for you.
Figures from the Arc Logistics Guide.
Price your own layout.
Pick a module, set the size, add a second wing. You see the price of the layout you draw, and the inside is tailored in design.
Complete and kit prices for every layout. GST included, logistics excluded.
Modular questions.
Can I get a mortgage on a modular dwelling?
Yes, Class 1A certification means an Arc Modular dwelling is treated the same as a traditional build by most lenders.
How long does council approval take?
Typically 6-12 weeks, depending on council and site conditions.
Can I customise the design?
Custom briefs go through Arc Studio first, then roll into the Modular build contract.
What's the total timeline from contract to keys?
Around 16 weeks, covering factory manufacture, delivery scheduling and install.
Is there a warranty?
Yes, covering the dwelling as a certified build. Ask on your call for the specific terms that apply to your contract.